UC-NGI-PL-end-users-I
From EGI Knowledge Base
Use Case title: Privately funded hardware
Short description: A group of users needs to join the Grid with privately funded and dedicated CPU and storage
Actors involved: RC manager, RC operator, VO administrators, local technical staff groups
Related requirement: CPU/storage dedicated exclusively to the project
Pre-conditions: Technical feasibility (electric power, space, cooling etc.), enough manpower for administration and service provision. Some technical and manpower redundancy required.
Steps:
- Evaluation of technical conditions
- Evaluation of service availability
- Hardware installation
- Configuration of queuing systems
- VO setup
- Service configuration
